Part one of the Chowchilla custom home begins in a green pasture with a survey tripod and a can of marking paint. Gary Wake trenched the footings, formed and poured the stem walls, set girders on piers, framed the floor, and raised the walls and roof trusses against the Central Valley sky.

Project
15 of 18
Category
Foundation & structural
Location
Chowchilla, CA
Scope highlights
6
Photographs
30

Custom home build: phase one

Staking an open pasture, pouring the stem walls, and raising a two-story frame

Every great custom home starts in the dirt. Here is the completed Chowchilla Spanish estate first, followed by the full field log showing how Gary Wake staked the pasture, poured the reinforced concrete stem walls, built the girder-and-joist floor deck, and craned the roof trusses into place.

The Chowchilla custom home: from pasture to framed walls: The finished estate standing on this foundation
The finished estate standing on this foundationTwo-story Spanish custom home in Chowchilla, CA built on the stem-wall foundation below

Chapter one of three: foundation & structural framing

Turning raw agricultural pasture into a rock-solid two-story frame

AWhere we started

Open pasture ground, zero utilities, and a multi-wing two-story layout

Raw agricultural ground. No pad, no utilities, no survey stakes. The soil had to be graded and compacted, the footings trenched deep and true, underground plumbing and conduit run before any concrete, and a perimeter foundation formed around a complicated, multi-wing floor plan with a two-story section in the middle.

BHow Gary Wake built it

Laser-leveled footing trenches, reinforced stem walls, pier girders, and crane-set trusses

The crew staked the pasture, cut the footing trenches, and set the forms. Reinforcing steel and plumbing stub-ups went in, and the footings and stem walls were poured and stripped. Wood girders were set on concrete piers across the interior, floor joists followed, and a plywood subfloor turned the foundation into a deck. Walls were framed flat and raised, the two-story section went up, and a crane set the engineered roof trusses while the crew nailed them off from above.

Foundation & framing scope delivered in phase one

6 highlights
  • 01Site survey, rough grading, and engineered soil compaction
  • 02Footing trenches and underground plumbing rough-in
  • 03Formed and poured reinforced footings and stem walls
  • 04Girders on concrete piers with floor joists and plywood subfloor
  • 05Wall framing including the two-story section
  • 06Engineered roof trusses set by crane

Talk with Gary Wake

Planning something similar?

Tell Gary about your house and what you are picturing for it. He explains the work in plain terms, puts every detail in a written contract, and responds within 2 business days.